normal loading conditionapec是什么意思思

New engineering challenges every week
Use your skills and earn money with your work
All aircraft engines require the use of efficient and cost effective brackets.
Additive manufacturing creates opportunities to build unique and highly efficient bracket-like structures.
Here is an opportunity to show your best design.
When designing critical components for aircraft engines, today’s designers are constantly challenged with the
tradeoff between performance requirements for strength
and stiffness on one hand and size and weight on the
other. Recently, software tools have been developed to aid
designers in optimizing their part designs. However,
today’s manufacturing methods restrict designers ability to take advantage of these optimized structures beyond a certain level of complexity. Additive manufacturing is lifting the constraints of
traditional manufacturing processes, giving designers the ability to grow practically any shape, enabling the use of fully optimized lightweight designs that do not sacrifice performance.
Participants in this challenge will use additive manufacturing as the basis for optimizing an existing aircraft engine bracket.
The designs submitted will be analyzed and evaluated via simulation, and the top ten designs will be selected for fabrication and testing. These optimized engine bracket designs will be additively manufactured and subjected to a given loading scenario. The winning entries will best satisfy all of the performance criteria with the lowest mass.
The part Loading brackets on jet engines play a very critical role: they must support the weight of the engine during handling without breaking or warping.
The brackets may be used only periodically, but they stay on the engine at all times, including during flight.
But these brackets aren’t the only parts on an engine that offer weight-reduction opportunities. There are many similar load-carrying parts on the engine that, because they were designed for conventional manufacturing technologies, are not fully optimized for both performance and weight.
By substantiating Additive Manufacturing in this particular case, we will enable significant weight savings throughout the engine.
The test section The designs entered in this competition that meet the weight and size envelope requirements will be evaluated by simulation for performance based on the load conditions given in Requirements Section below. The top ten designs will be manufactured using additive manufacturing and subjected to the defined load cases.
To simulate engine transport and demonstrate maximum load carrying capacity, the part will be subjected to the individual load conditions shown in the Requirements Section below with the specified load being applied to 3/4” diameter pin at interface 1 while interfaces 2-5 are fixed.
For designs that meet the performance criteria, the static loading will be increased to show ultimate capability.
Designs that do not match the interface dimensions will be disqualified.
This Challenge will have TWO phases: PHASE I: Submit an improved design based on the provided diagram and specs from June 12 to August 9 (note: extended on July 19, 2013). These designs will be analyzed and evaluated via simulation with the top ten designs awarded $1,000 each.
PHASE II: The top ten optimized engine bracket designs from Phase I will then be additively manufactured and subjected to a given loading scenario. The top 8 designs will receive awards from a total prize pool of $20,000. Phase II will run from September 17 to November 15 (note: dates changed after Phase I extension on July 19, 2013). The final announcement is set for mid-December.
Requirements
You can design your entry in any CAD software as long as STEP or IGES file is submitted.
The optimized geometry must fit within the original part envelope. STEP file will be available via the Download specifications button, soon.
Material: Ti-6Al-4V
Service Temperature: 75 F
Minimum material feature size (wall thickness): 0.050 in.
Interface 1: 0.75 inch diameter
pin. The pin is to be considered infinitely stiff.
Interfaces 2 – 5: 0.375-24 AS3239-26 machine bolt.
Nut face 0.405 in. max ID and 0.558 in. min OD. The bolts are to be considered infinitely stiff.
Load Conditions:
1. Max static linear load of 8,000 lbs vertical up.
2. Max static linear load of 8,500 lbs horizontal out.
3. Max static linear load of 9,500 lbs 42 degrees from vertical.
4. Max static torsional load of 5,000 lb-in horizontal at intersection of centerline of pin and midpoint between clevis arms.
Added based on Community questions (6/11/2013):
- Assume yield strength is 131 ksi.
- Participants should target the lightest weight designs.
Please post your mass or volume reduction compared to the original part envelope in your entry description. This will make it easier for the judges to sort the entries at the end of the Challenge. Thanks! (Added 06/14/2013)
See Official Rules at
for details. Contest opens on June 11, 2013.
Must submit at least one Entry by July 26, 2013 (extended to August 9, 2013) to be eligible for Phase II.
Must be 18 years of age or older to participate.
No purchase necessary. Void where prohibited.
THESE OFFICIAL RULES SUPERSEDE ANY OTHER RULES AND TERMS & CONDITIONS ON THE WEBSITE OF SPONSOR OR GRABCAD.
By registering for the competition, you accept the conditions stated in these official rules (), agree to be bound by the decisions of the judges and warrant that you are eligible to participate in the competition. If you do not accept all of these official rules, then please do not register for the competition. We recommend that you print a copy of these official rules for your future reference.
PHASE I – During Phase I, Entrants will create an improved aircraft engine bracket design using the design and specification information (“Design and Specs”) on the Competition Website.
Entrants can use any CAD software to create the design but the Entry must be submitted as a STEP or IGES file.
PHASE II – The top ten (10) Entries from Phase I will be additively manufactured and subjected to the loading scenarios defined on the Competition Website. The top eight (8) Entries with the lowest mass which also satisfy all the testing performance criteria (defined herein and also set forth on the Competition website) will receive additional prize awards (described herein).
The PHASE I of this Challenge starts on June 11, 2013 and ends on August 9, 2013 (note: extended end of Phase I on July 19, 2013).
PHASE II will run from September 17 to November 15 (note: dates moved due to Phase I extension, above). Final announcement is separate from Phase II dates.
Judging - Entries in Phase I and II will be analyzed and evaluated by a panel of (5) five judges (the “Jury”) comprised of experts from GE and GrabCAD.
PHASE I -The Entries will be analyzed and evaluated via simulation based on the identified performance criteria set forth on the Competition Website. Judging for Phase I will occur during a two week period from August 9th to August 23rd (dates moved due to Phase I extension, above).
The top ten (10) Entries that meet the performance will be selected as prize winners.
PHASE II – The top ten (10) Entries from Phase I will be additively manufactured and subjected to the defined load cases on the Competition Website. Entries also will be evaluated for suitability for production from an additive manufacturing perspective. Other considerations will include determining load at failure and long term durability. Judging for Phase II will occur during a three month period from September 17 to November 15 (note: dates moved due to Phase I extension). The top eight (8) Entries that satisfy all the performance criteria with the lowest mass will be selected as Phase II winners. Final announcement of Phase II winners is planned for mid-December.
Tag your entries with "generalelectric"
Phase I: $1,000 for each of the TOP 10 entries
Phase II: Additional awards for TOP 8 entries from a total prize pool of $20,000 as shown below.
PHASE I, 1-10th Prize
$1,000 cash each
PHASE II, 1st Prize
$7,000 cash
PHASE II, 2nd Prize
$5,000 cash
PHASE II, 3rd Prize
$3,000 cash
PHASE II, 4-8th Prize
$1,000 cash each
About the jury?
The Jury consists of judges who are experts from GE and GrabCAD.
GE works on things that matter. The best people
and the best technologies taking on the toughest
challenges. Finding solutions in energy, health
and home, transportation and finance. Building,
powering, moving and curing the world. Not just
imagining. Doing. GE works.
For more information, visit the company's website
wow, that's a more serious contest. Great news
has uploaded 70
CAD models & has left 2131 comments.
Please log in to add comments.
Total entries
Who’s in the jury?
Kaspar Kiis
GrabCAD, Mechanical Engineer
Jared Wolfe
Sub-Section Manager of the Advanced Externals Technologies team at GE Aviation
Gregg Wilson
GE, Section Manager of the Advanced Externals Design team
David Abbott
Mechanical Engineer, GE
Dr. William Carter
Mechanical Engineer, Additive Manufacturing Laboratory, GE Research
Have an awesome idea for this competition? Want to win cool prizes? Sign-up now to upload your entries.
Sign up to upload your ideas
Entries (644).1970957转载请声明出处8正8方8翻8译8网.6248195normal fault 正断层 normal loading condition 正常荷载条件 normal means of egress 正常出路 normal reciprocating 普通往复式 normal rent 原来租金;一般租金;十足租金 normal stress 正应力;正向应力 normally consolidated soil 正常固结土 North West New Territories Base Strategy Studies 新界西北部基本发展策略研究 North West New Territories Village Flood Protection Study 新界西北部乡村防洪措施研究 Northwest New Territories Development Strategy Review 新界西北发展策略检讨 nosing 梯级边缘;“级嘴” nosing tile 梯级边缘砖;“级嘴”瓷砖 Notes for Tenderers 投标须知 Notice by a Landlord of Increase in Rent by Agreement 业主呈报协议加租通知书 Notice by a Landlord of Rent Agreed for New Tenancy 业主呈报新租约所订租金通知书 Notice by a Landlord or Principal Tenant of Increase in Rent 业主致住客或主租客致分租客加租通知书 Notice of Alternation in Rent by Agreement 协议更改租金通知书 Notice of Assessment for Property Tax 物业税评税通知书 notice of authorization 授权公告 notice of cancellation 撤销通知书 Notice of Cancellation of Vesting 撤销转归公告 Notice of Correction of Valuation List 更正估价册通知书 notice of decision 决定通知书 Notice of Deletion 删除估价册内物业通知书 Notice of Evacuation 令迁出通知书 Notice of Eviction 收回房舍通知书 Notice of Increase in Rent 加租通知书 Notice of Increase in Rent on account of increase in rates or imposition of rates 业主因差饷增加或开征须向租客发出的加租通知书 Notice of Intention to Amend Valuation List 拟修正估价册记录通知书 Notice of Intention to Apply for a Closure Order 拟申请封闭令通知书 Notice of Interim Valuation 临时估价通知书 Notice of Lodgement of Money in Court 向法庭交存款项通知书 Notice of New Letting or Renewal Agreement 新租约或重订租约通知书 notice of objection 反对通知书 Notice of Objection to a Proposed Interim Valuation 就建议临时估价而提交的反对通知书 Notice of Payment of Subsidy 按揭还款补助金发放通知书 Notice of Rateable Value 应课差饷租值通知书 Notice of Removal of Projections or Objections 饬令拆除突出建造物或障碍物通知书 Notice of Re-occupation 物业重行使用通知书 Notice of Resumption 收地通告 notice of termination [tenancy] 终止租赁通知书 Notice of Termination of Principal Tenancy 终止二房东租约通知书 Notice of Termination of Tenancy by Landlord 业主终止租约通知书 notice of the alteration in rent 更改租金通知书 notice of transfer 转让通告 Notice of Vacancy 物业空置通知书 notice of valuation 估价通知书 notice to quit 迁出通知书 notifiable works 应呈报工程 Notification of Change of Ratepayer's Name and Address 差饷缴纳人更改姓名及地址通知书 notional building cost 估计建筑成本 notional rates 名义上的差饷 novation 约务更替 nuclear family 核心家庭 nuclear household 核心住户 nullah 明渠;防洪渠 nullah bridge 明渠大桥;防洪渠桥 nullah bund road 防洪渠旁道路 nullah deck clearance 清拆渠面僭建物 obscure wired glass 闷光钢丝网玻璃;毛面钢丝网玻璃 obscured glass 闷光玻璃;毛玻璃 observation well 观测井 obstruction 堵塞物;障碍物 obstruction detection system 障碍探测系统 occupancy position 住用情况;租用情况 occupancy rate 入住率;租用率 occupancy survey 居民登记 occupant 占用人;住客 occupation 占用;使用;居住 occupation certificate 入住证明书;“入伙纸” occupation density 居住密度 occupation permit 入住许可证;“入伙纸”;居住许可证〔平房区〕 occupier 占用人 occupier-owner 自住业主 offer 建议;编配单位 offer letter 配屋通知书;补偿及安置建议函件〔九龙城寨〕 offer letter to buy 购楼意向书 offeree 受要约人 offeror 要约人 office land 办公楼宇用地 Office Land Development Strategy 办公楼宇用地发展策略 office premises 写字楼 office-bearer [mutual aid committee] 执委〔互助委员会〕 offload jetty 卸货码头 off-port backup land 离岸后勤用地 off-port container backup facility 离岸货柜后勤设施 offshore 离岸地区;近海地区 offshore engineering 离岸工程;近海工程 offshore wave 离岸波 offshore wave climate 离岸波况 off-site 工地外 oil-base paint 油性漆 old estate 旧型屋 old scheduled agricultural lot 旧批农地;旧批约农地 old scheduled building 旧批建筑物;旧批约建筑物 old scheduled building lot 旧批屋地;旧批约屋地 old scheduled lot 旧批地段;旧批约地段 old scheduled rent 旧固定租金 old slope 旧斜坡 old-type low-rise timber structure 旧式层数较少的木构筑物 on monthly licence basis 以按月计临时租约方式 one-assignment clause 一次转让条款 one-bedroom flat 一睡房单位 one-brick wall 单砖墙;单砖厚墙 one-person flat 一人单位 one-person unit 一人单位 one-stop registration service 综合注册服务 one-stop search service 综合查册服务 on-farm domestic structure 农地住用构筑物 on-load operation 负载操作 on-load running test 负载运行测试 on-street shop 地铺 opaque glass 不透明玻璃 open air 露天地方 open area 露天场地 open balcony 开敞式露台 open bay 开敞式空格;开敞式架间 open car park 露天停车场 open channel 明渠 open channel supply system 露天水道输水系统 open cloth-drying area 露天晒布地 open corridor and staircase 开放式走廊及楼梯 open cut 明挖 open deck 露天广场 open excavation 露天挖掘工程;开挖工程 open instant tender 公开现场投标 open joint 张开节理;裂开节理 open market rent 市面租金 open market value 公开市值;十足市值 open nullah 大明渠 open piled jetty 透空式桩基突堤 open roof 平台 open seafloor mud disposal area 海上淤泥卸置区 open space 空地;休憩用地 open storage 露天仓库 open storage area 露天货仓;露天贮物用地 open tender 公开投标 open terrace 平台;露天平台 open user 土地用途不受限制 open working area 露天工地 open yard 天井 open-rental tender 公开竞出租金投标 open-textured road surface 多孔路面层 open-top roof 无上盖天台 open-type kiosk 开敞式摊档 Operations and Redevelopment Division [Housing Department] 行动及重建科〔房屋署〕 optical switch 感光开关 optional to renew [tenancy agreement] 可选择续约〔租赁协议〕 oral tenancy agreement 口头租赁协议;口头租约 order book [estate] 住户修理事项记录簿〔屋 〕 order for ejectment 驱逐令 order for recovery of possession 收回楼宇令 order for sale 售卖令 order to commence 开工令 ordinary commercial premises 普通商业楼宇 ordinary levelling 普通水准测量 ordinary Portland cement 普通水泥 ordinary shop 普通用途铺位 organic soil 有机土 orientation 定向;方位 original construction cost 原来建筑成本 original design 原设计 original plan 原来图则;原始图则 original rock 基岩 original tenancy 原租赁 original water content 原先含水量 ornamental plant 观赏植物 ornamental railing 装饰栏杆 orthophoto map 正射影像地图 out building 附属建筑物 out of repair 失修 outcrop 基石或岩石的露出部分;露头 outdoor exhibition area 户外展览场地 outdoor fair area 户外交易会场地 outdoor rent collection 上门收租 outdoor venue 户外场地 outer boom 外机臂 outer edge 外缘 outer wall 外墙 outfall 排水口;渠口 outfall block 排水口砌块 outlet drain 去水排水渠;出口排水渠 outlet pipe 排水管;去水管 outline area 大纲图涵盖地区 outline development plan 发展大纲图 outline zoning plan [OZP] 分区计划大纲图 outlying business district 市区外商业区 output assessment 造工评核 outrigger 起重臂;悬臂梁;斜撑 outright mortgage 立即按揭 outside repair 外部修葺 outside seating area 户外座位场地 outstanding demand 尚未满足的需求 outstanding Letter B 未换地的乙种换地权益书 outstanding works 未完工程 outward swinging metal gate 外掩铁闸 overall cohesiveness of design 结构严密的整体设计 overall dimensions 整体尺寸 overall shear failure 整体剪切破坏 overall vacancy trend 整体空置趋势 overbreak 超挖 overburden 超负荷;覆盖层 overcompaction 过度压实 overconsolidated soil 超固结土 over-coring method 套钻法 overcrowding 居住环境挤迫 overdevelopment 过度发展 overdredging 超挖 overflow 溢流;溢水口 overflow capacity 溢流容量 overflow pipe 溢流管;“满水喉”;“过刮喉” overflow weir 溢流堰 overhang 屋檐 overhanging 悬伸;突出;外悬 overhanging eaves 飞檐 overhanging rock 悬垂岩石;悬石 overhaul 大修;检修 overhead crane 高架起重机;桥式起重机 overhead door closer 上升卷门关闭器 overhead travelling crane 移动式高架起重机 overhead walking link 架空接驳行人道 overlay 覆盖层 overload 超荷载;超载 overshoot 涨溢 overstress 超限应力 overstressing of reinforcing steel 钢筋受超限应力 oversubscription 超额认购;超额申请 oversubscription rate 超额认购率;超额申请率 overtopping 越堤;漫顶;满溢 overturn 倾覆〔挡土墙〕;倒转 overturning moment 倾覆力矩;倾覆弯矩 owner 业主;业权人;拥有人 Owner Participation Scheme 业主参与发展计划 owner-occupation 业主自用;业主自住 owner-occupation flat 业主自用单位 owner-occupation premises 业主自用楼宇 owner-occupied 业主自用;业主自住 owner-occupier 自住业主 owners' association 业主协会 owner's committee 业主委员会 owner's consent 业主同意书 owners' corporation 业主立案法团 owners in common 分权拥有人 ownership 所有权;拥有权;业权 ownership flat 自置单位 ownership in common 分权共有权 oxygen-deficiency safety device 缺氧安全装置 package deal contract 统包合约 package development 组合发展;整体发展 package letting 把几个单位合为一组以一份合约出租 packer head 灌浆孔塞头 packer permeability test 压水试验;压水渗透试验 packer test 压水试验 pad foundation 垫式基础;垫式地基 paddle 桨叶;搅棒 padlock 挂锁;“荷包锁” "pai lau" 牌楼 pail latrine 粪桶厕所 paint 漆;涂料;油 painted steel 涂漆钢 painter 髹漆工 pallet 垫盘;托板 pallet fork-lift truck 托盘叉式起重车 panel 拼板 panel wall 墙板 panic barrier 紧急栏障 panic bolt 太平门栓 panic-bolt door 太平门 pannelled door 格板门 paper pulp plaster 纸巾灰浆 paraffin 石蜡 parallel arm installation type [door closer] 平行臂式〔门气鼓〕 paramount interest 首要权益 parapet 护墙;矮墙;护栏 parapet wall 护墙;矮墙;护栏 parent building 原身楼宇 parent lot 未分割前原来地段 park reserve 园林护理区 parking area 停车处 parking place 停车处 parking space 停车位 parking utilization rate 停车位使用率 parkway 林荫道 part ownership 部分所有权 part with possession 放弃管有权 part-built structure 半建成构筑物;半建成搭建物 partial closure 局部封闭 partial collapse 局部坍塌 partial completion 局部完成 partial completion certificate 局部竣工证书 partial non-development clearance 非发展性质的局部清拆 partial performance of works 完成部分工程 partial rent abatement period 免缴部分租金期 partial upgrading 局部改善 partially penetrating well 非完整井 partially weathered rock 局部风化岩层 particle 微粒;颗粒 particle size 粒径;粒度 particle size analysis 粒径分析 particle size distribution 粒径分布 particular specification 特别规格明细表 Particulars and Conditions of Sale 卖地详情及条件 Particulars of the Lot 地段详情表 partition 间隔 partition wall 间隔墙 partitioned flat 分间单位;“ 房” partitioning allowance 间隔津贴 partly self-contained flat 半独立单位 part-payment 购楼的部分定金 part-time parking space 部分时间租用停车位 party room 联谊室 party structure 共用构筑物 party wall 共用墙 passage 通道;通路 passage lock 通道锁 passageway 通道;通路 passenger hoist 载客升降机 passenger lift 载客升降机 passing rent 现时租金 passive area 休憩用地 passive earth pressure 被动土压力 passive facility 休憩设施 passive failure 被动损毁;被动破坏 passive recreation area 静态康乐用地 passive recreational facility 休憩设施 passive recreational use 静态康乐用途;休憩用途 passive resistance 被动压力 patch repair 小块修补 patching 修补 patent defect 明显的建筑缺陷;明显的建筑瑕疵 path 路径 patrol guard 巡逻护卫员 paved area 已铺路面的地区;已铺筑地区 pavement 路面;行人道 paver 铺路机 pavilion 凉亭 paving 铺砌面 paving block 铺路砖 paving stone 铺路石;铺面石板 pea gravel 小卵石 peak load 最大荷载;高 负荷 peat 泥炭;腐叶土;腐植土 pebble 圆砾;小卵石 pedestal 座墩;柱脚;基座 pedestal fire hydrant 座墩消防栓;柱形消防栓 pedestal toilet 坐厕 pedestal water closet pan 坐厕 pedestrian and vehicular access system 人车通道系统 pedestrian deck [public rental housing] 天桥廊〔租住公屋〕 pedestrian elevated walkway system 高架行人道系统 pedestrian parapet 行人道矮墙 pedology 土壤学 peg out the boundary 以栓钉标明地界;量定地界 pell-mell rubble 抛筑毛石;抛石;杂石 penal rating 惩罚性差饷 penetration test 贯入度试验 penstock 水闸 penthouse 屋顶房间;顶房;天台屋 percentage site coverage 覆盖百分比;覆盖率 perched water 上层滞水 perched water level 上层滞水位 percussion drilling 冲击钻探 percussion precast concrete pile 撞击式预制混凝土桩 performance area 表演场地 Performance Assessment Scoring System [PASS] 承建商表现评分制 performance bond 履约保证书;履约保函 performance venue 表演场地 pergola 花棚 pergola column 藤架柱;棚架柱;荫棚柱 period load 周期荷载 period of assignment 转让期 period of defects liability 保养期;保修期;维修责任期 period of final measurement and valuation 最终结算及估价期 period of Government lease 政府租契年期;土地批租年期 periodic tenancy 定期租赁 peripheral slope 围边斜坡 peripheral surface U channel 围边U形排水明渠 peri-urban area 市区外围地带 permanent building 永久建筑物 permanent construction 永久建筑 permanent deformation 永久变形 permanent facility 永久设施 permanent finish 永久终饰 permanent hardship case 长期困难户 permanent housing 永久房屋 permanent housing unit 永久居住单位 permanent lining 永久桩模 permanent partition 永久间隔 permanent prestressed ground anchor systems [public works category] 永久性预应力地锚桩基系统〔公共工程类别〕 permanent reinforced fill structure 永久性加固填筑结构 permanent reinstatement 永久修复工程 permanent structure 永久构筑物 permanent works 永久工程 permeability test 渗透试验;透水试验 permissible floor load 许可楼面荷载 permissible load 容许荷载 permissible settlement 容许沉降 permissible soil pressure 容许土压力 permissible stress 容许应力 permitted area 许可地区 permitted burial area for indigenous villagers 原居民许可墓地 permitted deduction 认可的应扣除款项 permitted occupier 核准住客 permitted plot ratio 核准地积比率;准许地积比率 permitted rent 准许租金;核准租金 permitted site coverage 认可上盖面积 permitted trades in factory buildings 工厂大厦认可行业 permitted user 许可使用者 perpetual resale restriction 永久转售限制 perpetuity 永久持有权 person space 人位 person trip 人次 pervious layer 透水层 phantom tenant 挂名租客 phase boundary 分期发展地区界线 phased improvement works 分期改善工程 phased occupation 分期占用 Philippine pebble 卵石米 photo mosaic 航空照片镶嵌图 photoelectric switch 光电式开关 photogeological lineament 航摄地质线;航摄地质特征 Photogrammetric and Air Survey Section [Lands Department] 摄影及航空测量组〔地政总署〕 Photogrammetric Operator 摄影测量操作员 photogrammetric plot 摄影测量图 photogrammetry 摄影测量 photographic reduction of map 缩影地图 photoprinting 晒图 photoscale 摄影比例尺 phreatic surface 地下水流面;地下水面 phreatic water 地下水 physical constraints map 自然地理限制图 physical design method 实体设计方法 physical layout 实际布置图 physical measurement 实际丈量;实际量度 physical obstruction 实质障碍 physical occupational boundary 实际使用地界 physical state and condition of the premises 楼宇的实质情况及状况 physical tidal model 实体潮汐模型 physically separable unit 可实际分隔单位 piano hinge 琴式铰链;“钢琴铰” picnic area 郊游地区 piecemeal development 零碎发展 piecemeal redevelopment 零碎重建 pier [building] 支柱〔建筑物〕 pier column 墩柱 pier foundation 墩式基础;墩式地基 pier lease 码头契约 pier-repair programme 码头修葺计划 piezometer data 测压计数据;水压计数据 piezometric level 测压管水位 pilaster 壁柱;半露柱 pile 桩;桩柱 pile cap 桩帽;桩承台 pile capacity 桩承载力 pile drawer 拔桩机 pile driver 打桩机 pile driving 打桩 pile driving analyzer 打桩分析仪 pile driving stress 打桩应力 pile extension 接桩 pile extractor 拔桩机 pile flutter 桩的颤动 pile foundation 桩地基;桩基础 pile frame 桩架 pile group 桩 ;桩组 pile hammer 桩锤 pile head 桩头 pile layout 桩的布置;桩的平面布置 pile load test 桩荷载测试 pile plan 打桩布置图 pile ring 桩箍 pile shaft 桩身 pile shoe 桩靴;“桩嘴” pile withdrawal test 拔桩测试 pile works 打桩工程 piled foundation 打桩地基;桩柱地基 piled jetty 桩基突堤 piled seawall 打桩海堤 piling 打桩 piling machine 打桩机 piling works 打桩工程 pillar 支柱;标石 pillar tap 立柱式龙头 pipe barrel 管筒 pipe bracket 水管托;“喉码” pipe culvert 管状暗渠;管状排水渠 pipe duct 入墙暗渠;喉管井道;“喉槽” pipe fittings 喉管配件 pipe jacking method 顶管法 pipe joint 管接头;喉管连接处 pipe laying works 管道敷设工程 pipe works 管道工程 piped gas supply system 喉管式气体供应系统 piped-gas distribution 气体燃料导管输送系统 pipeline 管道;管线 pipeline reserve 管道预留地 pipework 喉管 piping 喉管 piston sample 活塞取土器 pit 坑槽 pit cover 井槽盖 pit latrine 坑厕 pitch 斜度;间距 pitched roof 斜顶;斜尖屋顶 pitched slope breakwater 砌石护坡防波堤 pitched slope seawall 砌石护坡海堤 pits on slope 在斜坡开辟的洞口 pitting 孔蚀;点蚀 place of public assembly 公众聚会场所 place of public entertainment 公众娱乐场所 place of recreation and culture 文娱活动场所 plain concrete 素混凝土 plain tubular railing 光面管状栏杆 plane 平刨 plane cutter 刨刀 plane rectangular grid 平面直角坐标网 plane stress 平面应力 planimeter 求积仪 planing machine 刨 plank 木板 planking and strutting 板架支撑 plan-maker 制图者 plan-making process 制图过程 planned vacancy 有计划腾空的单位 planner 规划师 Planners Registration Board 规划师注册管理局 planning area 规划区 planning brief 规划大纲 planning enhancement 规划带来的改善 Planning, Environment and Lands Bureau [Government Secretariat] 规划环境地政局〔政府总部〕 Planning, Environment and Lands Bureau Technical Circular 规划环境地政局技术通告 Planning, Environment and Lands Policy Liaison Committee 规划、环境地政政策联络委员会 Planning Manual 《规划手册》 planning statement plan 规划纲领图 planning team co-ordinator 规划小组联络人 planning team leader 规划小组组长 planometer 测平器 plant room 机房 plant room door 机房门 plaster 抹灰;抹面;批荡;灰泥 plaster bead 灰泥墙角护条;灰泥护角 plaster board 灰泥板 plaster rendering 灰泥抹面 plaster wood 灰泥板 plastering 抹灰;抹面;批荡 plastic emulsion paint 乳胶漆 plastic failure 塑性损毁;塑性破坏 plastic hinge 塑性铰 plastic laminated sheet 层压塑料板;防火胶板 plastic limit 塑限 plastic settlement 塑性沉降 plastic strain 塑性应变 plastic yield test 塑料变形测试 platform 地台;平台 platform level 地台水平 play area 游乐场地 playground 游乐场;运动场 Playground Equipment and Safety Surface Committee 游乐场设备及安全地面小组委员会 playing field 运动场 Pleistocene stratum 更新统地层 pliability 可挠性;柔 性 plinth 基座;底座;柱脚 plot ratio 地积比率;建造比率 plotter 标绘仪;绘图仪 plug 插头;塞;“喉枳” plumbing 水管装置;水管敷设工程 plumbing and drainage 水管和排水设施 plumbing diagram 水管布置图 plumbing works 水管工程 plunger 柱塞 plywood 胶合板;“夹板” pneumatic tyred roller 气胎压路机 "pocket" park 小型公园 podium 平台 podium design 平台设计 podium level 平台层;平台高度 podium resting place 平台游憩用地 point block 塔式大厦 point load 集中荷载;点荷载 point one acre [0.1 acre] 十分一英亩;十分地 point zero one acre [0.01 acre] 百分一英亩;一分地 pointed squared-rubble wall 有勾缝的毛石墙 pointing 填缝;勾缝;填缝材料;“擦口” poldered village protection scheme 以土堤围绕乡村的防洪计划 pole holder 竹插筒;“炮筒” policy on safeguarding rational allocation of public housing resources 维护公屋资源合理分配政策 Policy Statement on Urban Renewal 《市区重建政策文件》 polish 打磨;抛光 polyamide epoxy paint 聚 胺环氧漆 polycarbonate sheet 聚碳酸脂纤维片;碳化纤维胶片 polychlorinated biphenyl 氯联苯 polyester 聚酯 polyethylene lining 聚乙烯内搪层 polyethylene sheeting 聚乙烯薄膜 polyethylene-lined steel pipe 聚乙烯内搪层钢管 polymer mix 混合聚合物;“吸水珠” polymer-modified mortar 聚脂强力砂浆 polysulphide sealant 多硫化物密封剂;多硫化物密封胶 polytetrafluoroethylene 聚四氨乙烯 polyurethane paint 聚氨基甲酸漆油 polyvinyl chloride [PVC] 聚氯乙烯 polyvinyl chloride pipe 聚氯乙烯水管;硬胶喉管 polyvinyl chloride wind shutter 塑胶防风板;硬胶防风板 poorly-maintained slope 维修不善的斜坡 pop-rivet 热铆铆钉;拉钉 population capacity 可容纳人口 population census 人口普查 population intake 可容纳人口 population profile 人口结构 population projection 人口推算 population support 人口数目 population threshold 人口界限;人口界线 porch 门廊 porch-like structure 门廊式构筑物;门廊式搭建物 porosity [concrete] 孔隙率〔混凝土〕 porous drain 多孔排水管 porous friction course 多孔面层 port backup land 港口后勤用地 共18页,第11页&&&&&&&&&&&&&&&&&&&&&&11&&&&&&&&&&&&&&&&.1970957转载请声明出处8正8方8翻8译8网.6248195
上篇文章:
下篇文章:
相关文章:}

我要回帖

更多关于 是什么意思 的文章

更多推荐

版权声明:文章内容来源于网络,版权归原作者所有,如有侵权请点击这里与我们联系,我们将及时删除。

点击添加站长微信